Plan
# 1
Plan 1 Construct new High School
How enrollment would be affected by the plan using current numbers
|
Roberts |
Jones |
Field
Store |
Holleman |
| Current
Enrollment |
535 |
199 |
487 |
612 |
If high school
was built and grades were redistributed across the board:
|
Roberts |
Jones |
Field
Store |
Holleman |
| Pk-3 |
429 |
150 |
400 |
509 |
| 4-5 |
704 (Today 4-5) |
|
|
|
| 6-8 |
1122
(Today 6-8) |
|
|
|
| 9-12 |
1324 |
|
|
|
Plan Specifics
Cons:
1.
Cost of construction for new high school
2.
Developing plan for use of Existing Junior High (see below)
3.
6th Grade with older Kids
Pros:
1.
Addresses all growth needs for longest period (K-12)
2.
Cost effective
3.
Least disruptive to existing schools
4.
No additional personnel costs other than normal population
growth
5.
New facility would be capable of 5A
6.
Addresses Junior High needs
Possible
Uses of Existing Waller Junior High
-
West-
Elementary (23
Rooms)
-
East- AEP,
Special Services, Community Meetings, Teacher Work/ Resources
-
Umland-
Administration, or Other Resource
Plan # 2
Add on as needed to Waller High School and Roberts Road without
building any new buildings.
Plan Specifics
Make changes to the high school as needed in the following areas:
- Academic
- Athletics
- Band
- Drill
Team
- Theatre
- Choir
- Library
- Cafeteria
Make Changes to Roberts Road in
the following areas
- Consider
core facilities gym and cafeteria
- Increase
classroom space
Other components of plan
- Maintenance
Needs as needed for other campuses
- Technology
needs for other campuses
Cons:
1.
High cost of remodeling the High School
2.
Elementary would need expensive core expansion
3.
High School would be locked into current layout because
with additions it will no longer be suitable for use for
anything but as a high school
4.
Roberts Road expansion would have to be balanced with
existing floodplain
5.
Roberts Road would exceed optimum elementary size
Plan # 3
Add on as needed to the
high school and then build a new elementary
Plan Specifics
-
High
School Changes as listed (see plan 2)
-
Construct
new elementary
-
Maintenance
needs and technology needs
Cons:
-
High
School Locked into current layout because with additions it will
no longer be suitable for use for anything but as a high school
-
No
alleviation of current junior high problems
-
Personnel
Increase to staff new school
-
Higher
cost than plan 2
Plan
# 4
Add on as needed to the High School then build a New Junior High
School
Plan
Specifics:
-
Pk-3
Elementaries
-
4-5
Schultz
-
Build
6-8 New Junior High with 6 wing
-
High
School additions as needed (see plan 2)
-
Maintenance
and technology needs
Cons:
-
Higher
cost over plans #
2,3
-
High
School Locked into current layout because with additions it will
no longer be suitable for use for anything but as a high school
-
6th
grade mixed with older students
|