2002-2003
@
Cost of proposals made by Current Facilities Committee (Plan
#1).
One
of the proposals is to build a new High School with a capacity
of 2000 to 2200 students.
The
cost for a new High School of this size (@ 325,000 sq.ft.)
would be @ $29 million dollars.
The
Land, Utilities, Roads, Drainage and etc. would be additional
cost.
The
Proposed Campus Improvements will cost @ $ 1.8 to $ 2.5 million
dollars.
The
Technology Needs cost will be @ $ 4.6 million dollars. (Over 5
years)
This
would make the total School Bond @ $ 35 to $ 38 million
dollars.
Alternative:
Build
a @ 80,000 sq.ft. Building for Band, Choir and Drama classes.
(Add new class rooms to old Band, Choir and Drama area in main
building.)
This
building would be West of the existing Band, Choir and Drama
rooms and have a cover
Walkway from main building.
Build
Field House for High School Athletics.
The
cost of these buildings would be @ $ 1 million dollars.
Build
a new Junior High School with a capacity of 1200 students. (6th,7th
and 8th Grades)
The
cost for a
new Junior High school of this size (@ 150,000 sq.ft.)
would be @ $15 million dollars.
The
Land, Utilities, Roads, Drainage and etc. would be additional
cost.
(If the land on FM 2920 was used this cost would be low.)
The
Proposed Campus Improvements will cost @ $ 1.8 to $ 2.5 million
dollars.
The
Technology Needs cost will be @ $ 4.6 million dollars. (Over 5
years)
This
would make the total School Bond @ $ 20 to $ 22 million dollars |