PROPOSED IMPROVEMENTS BY CAMPUS
2002-2003

ROBERTS RD ELEM
Parking – addition to N side of building
Hot water boiler (heat) with cover
Additional fencing
Covered walkway to portable buildings
Wall between gym and cafeteria
Doors – 10 sets
Security Cameras

HOLLEMAN ELEM
Restrooms – laminate stall doors
Ceiling – 2 x 2 tiles throughout building
PA System – upgrade
Fire Alarm System – upgrade
Security Cameras
Sidewalk from gym to bus drive
A/C – gym
Stage curtain – replace
Exterior doors – replace all
Covered walkways to portables

EAST CAMPUS
Parking
Chiller #2 – replacement
Roof repairs
Bleacher repairs
Basketball goals – electric controls
Stage – refinish floor, new curtains
Fire Alarm system – upgrade
PA System – upgrade
“Fire” door by gym – reestablish
Ceiling – 2 x 2 tiles throughout building
Doors – replace 4 sets
Lockers – student replacement
Lockers – additional in athletic area
Security Cameras
Telephone System – upgrade
JUNIOR HIGH - WEST CAMPUS
Restrooms – remodel (replace urinal troughs, replace partitions)
Ceiling – 2 x 2 tiles throughout building
Lounge area – remove kitchen equipment
Concrete areas between sidewalks and building (NW)
PA System – upgrade
Fire Alarm system – upgrade
Lockers – student replacement
Auditorium – additional house lights
Security Cameras
Telephone system – upgrade

ADMINISTRATION BUILDING
A/C unit fencing

JONES ELEM
Storage area for food service – new
Remove storage area on N side adjacent to boiler
P. E. equipment storage area – new
Covered walkways to portable buildings
Doors – 4 sets
Exterior asbestos removal
A/C – gym
Security Cameras
Delivery truck drive to kitchen area
Carpet
Close off drive under walkway between main buildings
Stage curtain

SCHULTZ MIDDLE SCHOOL
Athletic area – total renovation
Band area – practice rooms
Doors – 3 sets
Covered walkway to Life Skills portable
Cover sheetrock wall in main hallway with plastic laminate

HIGH SCHOOL
Awnings over all exposed doors (hallway to exterior)
Concrete – between Ag Bldg & tennis courts
-         between shop doors
-         between building and kitchen
-         all grassy areas adjacent to building
Doors – 10 sets
Covered walkways to portable buildings
Additional security cameras
Student pick-up drive - South side of building

TRANSPORTATION
BUILDING
Addition for office space
Additional restrooms
Drivers’ room renovation
Roof repair
SHOP/LOT
Additional shop bay
Additional bus parking

MAINTENANCE FACILITIES
Ceiling – 2 x 2 tiles throughout building
Warehouse renovations (roof)
Grounds shop renovations
Concrete parking areas – Maintenance and Print Shop

TAX/BUSINESS/ESL BUILDING

Toda informacion esta disponible en espanol sobre el pedido.  Por favor contacte a Waller ISD al 936.931.3685
Home
| About WISD | Parent Information | School Board 
Alumni Information
| Staff/Departments | Schools |
Site Index | Contact Us | Human Resources  | Staff E-mail
©2008 Waller Independent School District